Tilldelat.

Upphandling · Norge

Tonstad school - Invitation to competition - turnkey contract with interaction (stage 1).

TED-nummer
785135-2025
Status
Avslutad
Land
Norge
Upphandlande myndighet
Trondheim kommune
Sista ansökningsdag
12 november 2025
Förfarande
Två steg. Datumet gäller ansökan om att delta. Anbud lämnas sedan av de leverantörer som bjuds in.
Uppskattat värde
350 000 000 NOK
CPV-huvudkod
45000000Anläggningsarbete
Annonsens språk
engelska
Publicerad
26 november 2025

Trondheim kommune i Norge upphandlade Tonstad school - Invitation to competition - turnkey contract with interaction (stage 1).. Ansökningstiden gick ut 12 november 2025.

Annonsen är skriven på engelska. Titel och beskrivning återges som de står i TED, utan översättning. Kategorin anges med CPV-kodens svenska benämning.

Bevaka liknande upphandlingar i Norge

Om upphandlingen

Trondheim municipality shall construct a new primary school on the existing school site for Tonstad school, address Torvmyra 4, 7091 Tiller.A zoning process is ongoing and the development plan is expected to be approved by the town council in autumn 2026. Two pavilions/barracks shall be demolished. The school contains a sports hall and shall be adapted with areas for, among other things, a cultural school and music/culture in the surrounding area. The project includes development of outdoor areas, access to roads, goods delivery, sanitation etc., designed substrate that is the basis for pricing is a sketch project with a technical function description. Tonstad School shall be BREEAM-NOR certified with level 'very good'. The project shall be carried out with an emission free construction site and a high degree of re-use of elements that must be disassembled. The contract work shall be carried out as a turnkey contract with interaction. The purpose of the interaction phase is to design up to the preliminary project with a focus on system optimisation and risk management. Concretisation/details shall be carried out within the framework of the negotiated tender offer. Tentative general progress plan:- start-up interaction, May 2026 - start up detailed engineering design/execution phase, January 2027 - hand-over building, March 2029

Relaterat

Uppgifter: TED | Bearbetning: Tilldelat (tilldelat.se) | Publicerad i TED 26 november 2025 | Originalannons